Styrene Pump Replacement


Client:

Lyondell Chemical

Location:

South Charleston, WV

Project Value:

$250 K

Contract Amount:

$30 K

Description:

The Styrene Pump Replacement project was a retrofit in an existing facility located in a very congested area. This project required Augusta to provide the engineering and design services to replace four process pumps and upgrade the existing instrumentation and control equipment. For the project, Augusta specified the pumps and instrumentation, completed the electrical design and produced fabrication quality isometric piping drawings.